Go to content

POWER

IN MOTION

SEWER REFURBISHMENT USING SHORT PIPE RELINING

Felbermayr used what is called “short pipe relining” to refurbish a sewer in Graz during March. This process enabled a section of sewer approximately 600 m long to be refurbished extremely quickly, cheaply and with almost no excavation.

Go to report

Video

"HEAVY WORK" FOR WHEAT STARCH FACTORY

Heavy transports as well as lattice boom and mobile cranes were required within the course of the expansion of a wheat starch factory in the Lower Austrian town of Pischelsdorf in February.  

Go to report

 POSITION AS CRANE DRIVER 

We have a vacancy for a qualified Crane Driver.

Apply now

 

 

INFORMER

The Felbermayr Holding magazine.

Go to issue

© Felbermayr Holding GmbH · Machstraße 7 · A-4600 Wels · www.felbermayr.cc
22.04.2019